Parallel
The answer for the long narrow kitchens in older Phase 1-3 builder blocks. Hold 1.05m between counters minimum.
We design in Kumaraswamy Layout - near JP Nagar 6th Phase - and manufacture at our own factory in Dasanapura. Your kitchen is cut to the millimetre before anything reaches your flat.
Most interior companies in Bangalore design a kitchen and send it to a fabricator. We own the factory. Every module is cut on Cabinet Vision at our Dasanapura plant, and when something goes wrong, it lands on our own table - which is a strong incentive to get it right the first time.
DezinePro has designed and manufactured over 1,250 homes across Bangalore since 2004. We serve all around JP Nagar.
We serve JP Nagar and nearby areas as well — Banashankari, Jayanagar, Bannerghatta Road and the neighbourhoods around Kumaraswamy Layout — from the same design studio and Dasanapura factory.
This is where most Bangalore quotes hide the difference. Ours doesn't move:
| Shutters | 18mm HDHMR - not MDF, not particle board |
| Carcass | MR or BWP plywood. BWP under the sink and in the wet zone, always |
| Hardware | Hettich or Häfele - hinges, channels, lift-ups |
| Sinks & chimneys | Carysil, Faber |
| Production | Every module cut on Cabinet Vision at our own Dasanapura factory |














The answer for the long narrow kitchens in older Phase 1-3 builder blocks. Hold 1.05m between counters minimum.
RBI Layout and Dollar's Colony bungalow kitchens. The footprint is there; use it.
Perfect for newer apartments off Kanakapura Road and JP Nagar Phase 7.
For open-plan renovated bungalows. Needs 1m clear on all sides.
Compact 1BHK flats and rental units.
Because there's nobody between the drawing and the board. No fabricator's margin, no carpenter's markup, and no opportunity for someone to quote plywood and deliver particle board. We cut it ourselves and we carry the warranty ourselves.
Cost depends on layout, running feet and finish. Retaining a sound existing platform in an older house reduces this - ask us to assess it at survey.
We quote itemised - module by module, hardware line by hardware line. You'll see what each drawer costs.
Payment is staged 10 / 50 / 35 / 5 - 10% to start design, 50% at production release, 35% at installation, 5% after final inspection. You are never more than one milestone ahead of the work.
Most single-kitchen projects complete in 15 - 30 days from execution start. Because modules are manufactured at Dasanapura and arrive finished, the disruption inside your home is measured in days, not weeks.
01
We visit your space in JP Nagar, measure, and discuss your budget and style.
02
You get a 3D design concept and a fixed-cost quote, typically within a few days.
03
You approve the written material sheet before we cut anything.
04
Our in-house team handles fabrication and installation, with regular updates.
05
Final inspection, handover, and your workmanship warranty begins.
A carpenter can build you a kitchen that looks right on handover day. Whether it still closes properly in year five comes down to what's inside the shutter, and who's accountable for it.
| Criteria | DezinePro — Factory-Made | Typical Carpenter-Made |
|---|---|---|
| Board & cutting | 18mm HDHMR, cut on Cabinet Vision CNC at our Dasanapura factory, tolerances under 1mm. | Local ply or MDF, hand-cut on site — quality shifts with the batch and the day. |
| Moisture zones | BWP plywood fixed under the sink and in the wet zone, edges sealed at the factory. | Board grade is usually a verbal promise; edge-sealing is inconsistent on-site. |
| Hardware | Branded Hettich or Häfele, fitted to spec. | Hardware is often substituted for cheaper alternatives to protect margin. |
| Finish consistency | Factory-applied laminate and edge-banding, identical across every module. | Finish depends on site dust, humidity, and the carpenter's day. |
| Accountability | Written 10-year warranty from the same company that manufactured the kitchen. | A verbal promise from someone who may not be reachable in year three. |
| Disruption at home | Modules arrive finished; install runs 15–30 days. | Cutting, sanding and fitting happen inside your home for weeks. |
The laminate can look identical on both. What's inside the shutter — and who answers the phone in year five — usually isn't.
It depends on layout, running feet and finish. All tiers use 18mm HDHMR shutters, MR/BWP plywood and Hettich or Häfele hardware - only the laminate finish varies. Book a free consultation for an itemised quote.
Yes. We measure the stairwell turn, landing width and door clear opening at survey, then size the modules to fit the building. This is checked before production release, not on delivery day.
Frequently yes. Platforms in older JP Nagar homes are often level and sound, and retaining one reduces cost. We assess it at survey rather than defaulting to demolition.
10 years on the modular kitchen from the date of project inspection, plus 1 year on workmanship.
Yes. Many older JP Nagar blocks restrict work hours and weekend access. Share those rules at survey and we build them into the schedule upfront.
Yes. For let-out properties the priority is durability and low maintenance - which is exactly what 18mm HDHMR and Hettich hardware deliver over cheaper alternatives.
Yes. We deliver across Bangalore from our design studio in Kumaraswamy Layout and our manufacturing facility in Dasanapura on Tumkur Road.
Developers in Phase 1–4 buildings rarely leave a clean duct path from the kitchen to the utility balcony. We survey the existing duct run before quoting, not after — it's the single biggest cause of a JP Nagar kitchen slipping its date.
Yes, and it's worth it in most Phase 6, 7 and 9 apartments, where the L-shape leaves a dead corner. A Hettich carousel or magic corner recovers roughly 4–5 cu ft of storage you've already paid for in floor space.
Large parts of JP Nagar run on borewell supply, and hard water is harder on stainless steel over time. We'll walk you through the sink and tap spec at consultation rather than defaulting to the cheapest option.
Every module, hardware line and finish is priced separately — shutters, carcass, hinges, channels, sink and chimney. You see what each drawer costs before you approve anything.
10% to start design, 50% at production release, 35% at installation, and 5% after final inspection. You're never more than one milestone ahead of the work.
Let us know what you're looking for.